Metro Line 3 & LRT Timetable Change Ahead of Construction Work
Trains will begin at 6:15 AM, running until 10:30 PM from Adly Mansour and 11 PM from Rod El Farag Corridor.
Green Line 3 of Cairo Metro and the LRT will be operating under an adjusted timetable, ahead of planned construction work for the line’s next phase. As of now, trains will begin operation from 6:15 AM from both ends of the line - Adly Mansour and Rod El Farag Corridor - and the last trains will depart each terminus at 10:30 PM and 11 PM respectively. Stations will shut at 12 PM midnight.
The new schedule also means that the last intersection between Line 3 and the first and second lines at Nasser and Attaba stations is 11:15 PM, for those who need to change lines to reach their destination.
The timetable was previously changed in February for the same reason, running from 6 AM until 11:30 PM until the beginning of Ramadan.
Trending This Week
-
Nov 17, 2024
-
Nov 17, 2024