Tuesday April 30th, 2024
Download the app
Copied

Metro Line 3 & LRT Timetable Change Ahead of Construction Work

Trains will begin at 6:15 AM, running until 10:30 PM from Adly Mansour and 11 PM from Rod El Farag Corridor.

Cairo Scene

Metro Line 3 & LRT Timetable Change Ahead of Construction Work

Green Line 3 of Cairo Metro and the LRT will be operating under an adjusted timetable, ahead of planned construction work for the line’s next phase. As of now, trains will begin operation from 6:15 AM from both ends of the line - Adly Mansour and Rod El Farag Corridor - and the last trains will depart each terminus at 10:30 PM and 11 PM respectively. Stations will shut at 12 PM midnight.

The new schedule also means that the last intersection between Line 3 and the first and second lines at Nasser and Attaba stations is 11:15 PM, for those who need to change lines to reach their destination.

The timetable was previously changed in February for the same reason, running from 6 AM until 11:30 PM until the beginning of Ramadan.

×

Be the first to know

Download

The SceneNow App
×